One Step Retail Solutions Community Forums
Home      Members   Calendar   Who's On
Welcome Guest ( Login | Register )
      

Home » Products » Retail Pro » Running Build Totals (SRO) on scheduler


Running Build Totals (SRO) on schedulerExpand / Collapse
Author
Message
Posted 8/21/2008 12:57:57 PM
Forum Member

Forum MemberForum MemberForum MemberForum MemberForum MemberForum MemberForum MemberForum Member

Group: Forum Members
Last Login: 12/16/2008 9:38:32 AM
Posts: 48, Visits: 176
We have Build Totals (v 8.4), aka SRO, set up on the scheduler to run nightly.  Recently it has not been updating properly.  When I view the SRO date range screen the dates analyzed are those of a manual run, rather than that of the scheduled run time.  The scheduler shows it takes nearly 9 minutes to run.  When running it manually through Retail Pro it takes less than 30 seconds.  Our parameters are 100 days, 100 days ago.  I'm sure I have the parameters written correctly as I have these same instructions on a separate main and it runs in less than 15 seconds and updates properly.

Hope you can give me some tricks to correct this.  Thanks.

Linda Helmer/Tile For Less

Anyone planning to attend next month's User Conference in SD?

Post #6888
Posted 8/21/2008 3:22:44 PM


Forum Member

Forum MemberForum MemberForum MemberForum MemberForum MemberForum MemberForum MemberForum Member

Group: Forum Members
Last Login: 12/21/2008 6:57:57 PM
Posts: 33, Visits: 161
Here what I use just double check to make sure you have the information entered correctly. I do not have a date range but i think it is better to specify months instead of days.

Good luck


Burak Sardag

  Post Attachments 
sro.JPG (31 views, 55.26 KB)
Post #6889
Posted 8/27/2008 10:56:41 AM
Forum Member

Forum MemberForum MemberForum MemberForum MemberForum MemberForum MemberForum MemberForum Member

Group: Forum Members
Last Login: 12/16/2008 9:38:32 AM
Posts: 48, Visits: 176
Thanks for your input, Burk.  My parameters were written correctly.  We finally discovered the problem.  I have a lockout period set up through system preferences.  When I scheduled the Build Totals to run outside the lockout period, it ran properly.  I also have RPRODB running within the lockout period, and it appears to run correctly.  Go figure...

Linda

Post #6892
Posted 8/27/2008 11:00:12 AM
Forum Member

Forum MemberForum MemberForum MemberForum MemberForum MemberForum MemberForum MemberForum Member

Group: Forum Members
Last Login: 12/16/2008 9:38:32 AM
Posts: 48, Visits: 176
Sorry for misspelling your name, Burak.  Again, thanks for the tip.

Linda

Post #6893
« Prev Topic | Next Topic »


Reading This TopicExpand / Collapse
Active Users: 1 (1 guest, 0 members, 0 anonymous members)
No members currently viewing this topic.
Forum Moderators: SirShagg, Brett R, ppishko, cwood

PermissionsExpand / Collapse

All times are GMT -7:00, Time now is 12:35am

Powered By InstantForum.NET v4.1.1 © 2009
Execution: 0.109. 18 queries. Compression Enabled.