| | | Forum Member
       
Group: Forum Members Last Login: 2 days ago @ 10:28:44 AM Posts: 48, Visits: 172 |
| | We have Build Totals (v 8.4), aka SRO, set up on the scheduler to run nightly. Recently it has not been updating properly. When I view the SRO date range screen the dates analyzed are those of a manual run, rather than that of the scheduled run time. The scheduler shows it takes nearly 9 minutes to run. When running it manually through Retail Pro it takes less than 30 seconds. Our parameters are 100 days, 100 days ago. I'm sure I have the parameters written correctly as I have these same instructions on a separate main and it runs in less than 15 seconds and updates properly. Hope you can give me some tricks to correct this. Thanks. Linda Helmer/Tile For Less Anyone planning to attend next month's User Conference in SD? |
| | | | 
Forum Member
       
Group: Forum Members Last Login: 11/13/2008 7:00:12 AM Posts: 33, Visits: 158 |
| Here what I use just double check to make sure you have the information entered correctly. I do not have a date range but i think it is better to specify months instead of days.
Good luck
Burak Sardag
|
| | | | Forum Member
       
Group: Forum Members Last Login: 2 days ago @ 10:28:44 AM Posts: 48, Visits: 172 |
| | Thanks for your input, Burk. My parameters were written correctly. We finally discovered the problem. I have a lockout period set up through system preferences. When I scheduled the Build Totals to run outside the lockout period, it ran properly. I also have RPRODB running within the lockout period, and it appears to run correctly. Go figure... Linda |
| | | | Forum Member
       
Group: Forum Members Last Login: 2 days ago @ 10:28:44 AM Posts: 48, Visits: 172 |
| | Sorry for misspelling your name, Burak. Again, thanks for the tip. Linda |
| |
|
|